Journal
7 Sep 2026

The Job That Comes Back Twice

Rework is the most expensive thing in a service business and the hardest to see, because while it is happening it feels like being thorough. The fix is almost always at the front of the job, not at the end.

Resonaverde blog cover, Processes, edition No.28

There is a version of a business where work goes out once. Somebody does a piece of work, it is reviewed, it is right, it goes. Not because everyone is unusually careful, but because what they were given at the start told them what right looked like.

Most businesses are not far from that, and they have no idea, because the distance is hidden in a category nobody measures.

Rework does not appear on any report. It does not have a code in the practice management system. It cannot be found in a P&L. And while it is happening it does not feel like waste at all, it feels like care, which is exactly why it survives in businesses that are otherwise well run.

The tell is simple. The same job coming back for a second go.

Why it costs more than it looks

It is paid for twice, at full rate. The first attempt was not free. Somebody's hours went into it, and if the work is billable those hours often cannot be charged, which means the second attempt is funded out of margin.

It costs the reviewer as well. Every returned job takes a second review. The most senior person in the chain reads the same work twice, and that is the most expensive hour in the building spent on something already done once.

It moves the deadline without anyone deciding to. A job that goes around twice takes twice the elapsed time, and the extra usually comes out of the buffer that other work was relying on.

It teaches people to slow down. After a few returns, people start double-checking work that never needed it, and asking rather than deciding. That is a real cost and it never shows up as one.

Where it actually starts

The instinct is to look at the person who did the work. Almost every time, the trail runs back past them to what they were handed.

The brief was thin. Enough to start, not enough to finish. The gaps got filled with reasonable assumptions, and reasonable assumptions are the whole problem, because two capable people fill them differently.

Nobody ever said what good looked like. No example, no previous version, no standard. The person had to guess the finish line and then got told they had guessed wrong.

The scope moved after the work began. The job that came back is not the job that went out, and nobody named the change, so it reads as a mistake instead of a revision.

The reviewer's standard lives only in their head. If the only place the standard exists is in one person's judgement, everyone else is working towards a target they cannot see. Some of them will hit it and some will not, and neither outcome is really about skill.

Following one back

A report goes out and comes back with a note asking for the figures split by month rather than by quarter. Ten minutes to fix. Nobody thinks about it again.

Trace it properly and the ten minutes is not the story. The person who built it was told which figures to include and where to find them, and nothing at all about how it would be read. The person who asked for it knew it was going to a board that always looks at monthly movement, because they have sat in that room for six years. That never got said, because to them it is not information. It is just how things are.

So the work was correct and still wrong, and the distance between the two was one sentence at the start that nobody thought to say.

That is what almost every returned job looks like underneath. Not a standards problem, and not somebody being careless. Context that lives so deep in one person's assumptions that they no longer recognise it as something another person would need.

What the fix actually is

Fix the front of the job, not the end of it.

Give people an example. One finished piece of past work is worth more than a page of instructions, and it takes ten seconds to attach.

Say what done means before the work starts, in a sentence. Name the two or three things that must be true for this to be finished.

Name the audience and the decision. Who reads this, and what will they do with it. Half of all rework is work pitched at the wrong reader.

Flag the parts you are unsure about, at the start. If something is genuinely undecided, say so, rather than letting someone build on it and then unpick it.

And when something does come back, treat the return as information about the brief. Ask what was missing at the start, not what went wrong at the end. It is a better question and it is the only one that stops it happening again.

What to do with this

Think of the last three pieces of work that came back for a second go. For each, write one line on what the person was given at the start.

If two of the three trace to the same gap, and they usually do, you have found the single most valuable thing to fix in your process this quarter. Not because rework is dramatic, but because it is the only cost in the business you are currently paying twice for and calling it thoroughness.